Recent installs
School Soccer Field Install in Southern California
A school campus field rebuilt with new artificial turf, inlaid lines and logos, goals and tall ball-stop netting. Installed by Turf Plus Pro, with Isaac Rau involved in developing the project.

The project at a glance
| Site | A school campus field in Southern California (school name withheld) |
| Scope | New artificial turf, seaming, inlaid lines and school logos, goals, ball-stop netting |
| Lines | White and yellow lines for more than one sport |
| Timeline | Turf installed in February 2026, field finished and photographed in March 2026 |
| Installer | Turf Plus Pro, CA State Contractors License #1150527 |
| Project development | Isaac Rau, Fields Consultant |
How it was built
From bare base to game day
Photos and video from the crew during the install.

Early February 2026
Turf rolls going down
The new turf went down in long rolls, one strip at a time, with seam tape laid out under every joint before the next roll goes down beside it.

February 2026
Seams joined across the field
Each roll was joined to the next along the seam tape. Done right, a seam disappears into the field, which is what you want under a ball rolling at full speed.

Mid February 2026
Lines and logos inlaid
Field lines and the school logos are inlaid in colored turf instead of painted on top, so they hold their color. White and yellow lines let the field host more than one sport.
The finished field
The field was finished and walked in March 2026. New turf edge to edge, crisp lines, the school logo at midfield and full-size goals backed by netting.
Ball-stop netting on tall poles runs around the field. On a campus next to roads and a freeway, it keeps balls in play and off the street, the same reason families add netting at home.


Walk the field
A member of the install team walks the field after the lines and logos went in, from the sideline markings to the logo at midfield.
Every detail you see here, the seams, the inlaid lines, the netting, is the same work that goes into a backyard pitch, just at a bigger scale.

Who worked on it
Isaac Rau on this project
Isaac was involved in the development of this field and was on site when it was finished in March 2026. He is part of the Turf Plus Pro team, and he brings the same process to every backyard pitch he plans.
What this means for your yard
A school field and a backyard pitch are built the same way. A level, draining base. Turf seamed so you can’t feel the joins. Lines that last. Netting where balls would otherwise end up in the street or the neighbor’s yard.
The crew that built this field builds our backyard, front yard and driveway pitches too.
Ready to see your yard as a pitch?
Send a few photos and rough measurements. We’ll come back with a layout, options and a price.